
Pitea Van bus awning
The Pitea Van bus awning is an awning for minivans, camper vans and panel vans that have a sliding side door. The tent connects directly to the car with the practical airlock and thus extends the living space of the vehicle, quickly and easily upgrading any vehicle into a practical and comfortable camping home. The Pitea Van can also be used free-standing as a full tent.
- Capacity: 4 people
- Poles: fibreglass
- 2 steel pitching poles for sunroof
- Material (flysheet): 190T polyester PU coated
- Material (groundsheet): 100 g/m² PE fabric
- 3000 mm water column and sealed seams
- Fully sewn-in groundsheet
- 2 windows with blinds
- Attachments for the vehicle (guy ropes)
- Freestanding, even without vehicle
- Incl. 3-language assembly instructions and repair kit
- Dimensions: 300 x 300 x 225 cm / Weight: 9 kg
- Pack size: 68 x 26 x 26 cm

Flexible
The Skandika Pitea Van bus awning is a high-quality awning that quickly and easily transforms a vehicle into a practical and comfortable camping home. The Pitea Van offers flexibility and extra space for holidays, camping and road trips.

Plenty of space
The awning, measuring 300 x 300 cm and with a standing height of 225 cm, offers plenty of space for up to 4 people and is connected directly to the car, extending the living space of the vehicle by 9 m².

Freestanding
Day trips by car are no problem, because the awning is free-standing - simply detach the airlock from the vehicle and drive off. The airlock entrance can also be closed with a door, which means that the bus awning can also be used as a fully-fledged tent.

Compatibility
The Pitea Van is an awning for minivans, camper vans and panel vans with a sliding side door. The awning is attached directly to the car using the lock. The fastening is secure and stable thanks to the extra thick material on the lock.

Weatherproof
The robust tent material with a water column of 3000 mm and the carefully sealed seams make the awning completely waterproof and the sturdy fibreglass poles can withstand even strong winds.

Sewn-in groundsheet
The tent has a firmly sewn-in groundsheet and all entrances, including the one in the airlock, have double doors. The mosquito nets on all 3 doors and at the airlock entrance prevent insects from entering the tent.

Many entrances / windows
In addition to the airlock door, the Pitea Van has 3 further entrances, one on each side. When the doors are closed, the 2 ventilation openings in the roof contribute to a pleasant indoor climate and the 2 windows provide plenty of light, but can be darkened at night.

Sun canopy
One of the three entrance doors can be converted into a sun canopy using the 2 steel poles supplied. This allows you to create an additional shaded area on one side of the tent.

Simple set-up
Assembly instructions in 3 languages are included for easy assembly. With its weight of just 9 kg and small pack size, the bus awning is easy to transport and stow away. A repair kit is also included in the scope of delivery.

Flexible
The Skandika Pitea Van bus awning is a high-quality awning that quickly and easily transforms a vehicle into a practical and comfortable camping home. The Pitea Van offers flexibility and extra space for holidays, camping and road trips.

Plenty of space
The awning, measuring 300 x 300 cm and with a standing height of 225 cm, offers plenty of space for up to 4 people and is connected directly to the car, extending the living space of the vehicle by 9 m².

Freestanding
Day trips by car are no problem, because the awning is free-standing - simply detach the airlock from the vehicle and drive off. The airlock entrance can also be closed with a door, which means that the bus awning can also be used as a fully-fledged tent.

Compatibility
The Pitea Van is an awning for minivans, camper vans and panel vans with a sliding side door. The awning is attached directly to the car using the lock. The fastening is secure and stable thanks to the extra thick material on the lock.

Weatherproof
The robust tent material with a water column of 3000 mm and the carefully sealed seams make the awning completely waterproof and the sturdy fibreglass poles can withstand even strong winds.

Sewn-in groundsheet
The tent has a firmly sewn-in groundsheet and all entrances, including the one in the airlock, have double doors. The mosquito nets on all 3 doors and at the airlock entrance prevent insects from entering the tent.

Many entrances / windows
In addition to the airlock door, the Pitea Van has 3 further entrances, one on each side. When the doors are closed, the 2 ventilation openings in the roof contribute to a pleasant indoor climate and the 2 windows provide plenty of light, but can be darkened at night.

Sun canopy
One of the three entrance doors can be converted into a sun canopy using the 2 steel poles supplied. This allows you to create an additional shaded area on one side of the tent.

Simple set-up
Assembly instructions in 3 languages are included for easy assembly. With its weight of just 9 kg and small pack size, the bus awning is easy to transport and stow away. A repair kit is also included in the scope of delivery.

Pitea Van bus awning
The Pitea Van bus awning is an awning for minivans, camper vans and panel vans that have a sliding side door. The tent connects directly to the car with the practical airlock and thus extends the living space of the vehicle, quickly and easily upgrading any vehicle into a practical and comfortable camping home. The Pitea Van can also be used free-standing as a full tent.
- Capacity: 4 people
- Poles: fibreglass
- 2 steel pitching poles for sunroof
- Material (flysheet): 190T polyester PU coated
- Material (groundsheet): 100 g/m² PE fabric
- 3000 mm water column and sealed seams
- Fully sewn-in groundsheet
- 2 windows with blinds
- Attachments for the vehicle (guy ropes)
- Freestanding, even without vehicle
- Incl. 3-language assembly instructions and repair kit
- Dimensions: 300 x 300 x 225 cm / Weight: 9 kg
- Pack size: 68 x 26 x 26 cm

Flexible
The Skandika Pitea Van bus awning is a high-quality awning that quickly and easily transforms a vehicle into a practical and comfortable camping home. The Pitea Van offers flexibility and extra space for holidays, camping and road trips.

Plenty of space
The awning, measuring 300 x 300 cm and with a standing height of 225 cm, offers plenty of space for up to 4 people and is connected directly to the car, extending the living space of the vehicle by 9 m².

Freestanding
Day trips by car are no problem, because the awning is free-standing - simply detach the airlock from the vehicle and drive off. The airlock entrance can also be closed with a door, which means that the bus awning can also be used as a fully-fledged tent.

Compatibility
The Pitea Van is an awning for minivans, camper vans and panel vans with a sliding side door. The awning is attached directly to the car using the lock. The fastening is secure and stable thanks to the extra thick material on the lock.

Weatherproof
The robust tent material with a water column of 3000 mm and the carefully sealed seams make the awning completely waterproof and the sturdy fibreglass poles can withstand even strong winds.

Sewn-in groundsheet
The tent has a firmly sewn-in groundsheet and all entrances, including the one in the airlock, have double doors. The mosquito nets on all 3 doors and at the airlock entrance prevent insects from entering the tent.

Many entrances / windows
In addition to the airlock door, the Pitea Van has 3 further entrances, one on each side. When the doors are closed, the 2 ventilation openings in the roof contribute to a pleasant indoor climate and the 2 windows provide plenty of light, but can be darkened at night.

Sun canopy
One of the three entrance doors can be converted into a sun canopy using the 2 steel poles supplied. This allows you to create an additional shaded area on one side of the tent.

Simple set-up
Assembly instructions in 3 languages are included for easy assembly. With its weight of just 9 kg and small pack size, the bus awning is easy to transport and stow away. A repair kit is also included in the scope of delivery.

Flexible
The Skandika Pitea Van bus awning is a high-quality awning that quickly and easily transforms a vehicle into a practical and comfortable camping home. The Pitea Van offers flexibility and extra space for holidays, camping and road trips.

Plenty of space
The awning, measuring 300 x 300 cm and with a standing height of 225 cm, offers plenty of space for up to 4 people and is connected directly to the car, extending the living space of the vehicle by 9 m².

Freestanding
Day trips by car are no problem, because the awning is free-standing - simply detach the airlock from the vehicle and drive off. The airlock entrance can also be closed with a door, which means that the bus awning can also be used as a fully-fledged tent.

Compatibility
The Pitea Van is an awning for minivans, camper vans and panel vans with a sliding side door. The awning is attached directly to the car using the lock. The fastening is secure and stable thanks to the extra thick material on the lock.

Weatherproof
The robust tent material with a water column of 3000 mm and the carefully sealed seams make the awning completely waterproof and the sturdy fibreglass poles can withstand even strong winds.

Sewn-in groundsheet
The tent has a firmly sewn-in groundsheet and all entrances, including the one in the airlock, have double doors. The mosquito nets on all 3 doors and at the airlock entrance prevent insects from entering the tent.

Many entrances / windows
In addition to the airlock door, the Pitea Van has 3 further entrances, one on each side. When the doors are closed, the 2 ventilation openings in the roof contribute to a pleasant indoor climate and the 2 windows provide plenty of light, but can be darkened at night.

Sun canopy
One of the three entrance doors can be converted into a sun canopy using the 2 steel poles supplied. This allows you to create an additional shaded area on one side of the tent.

Simple set-up
Assembly instructions in 3 languages are included for easy assembly. With its weight of just 9 kg and small pack size, the bus awning is easy to transport and stow away. A repair kit is also included in the scope of delivery.
Any questions? We're here to help you!
Send us a message here
















