
Helsinki 6 tunnel tent
6-person tent with flexible tent wall and 215 cm headroom
In stock
Free delivery in GER
2-year warranty
30-Day Returns Policy
Highlights
- Large sleeping cabin with optional partition wall
- Movable tent wall for larger living area or extra canopy
- Mosquito nets on windows and sleeping cabins
- Windows with blackout for restful sleep
- Very high water column of 5,000 mm
Skandika tunnel tent Helsinki 6 persons
The HELSINKI is a versatile tunnel tent for groups and families of up to 6 people. The tent is super easy to pitch and yet offers high stability and good weather protection. The modern colours give the HELSINKI a sleek appeal and the mosquito netted windows and breathable tent material contribute to a good indoor climate.
At the rear is the sleeping cabin, which is fitted with a partition wall so that it can also be used as two smaller areas. Thanks to the zip-out front wall, the HELSINKI boasts either a surprisingly large living area or a spacious canopy, which can be used as a retreat protected from the wind and sun, a play area or a cooking area. Two groundsheets are included so that you can utilise the versatility of this practical tent with dry and clean feet. The water column values of a tent provide information about the quality and strength of its waterproofness, whereby a tent is considered waterproof from 1200 mm. The HELSINKI offers you a water column of 5000 mm and therefore very good weather protection. The tent poles of the HELSINKI are made of unbreakable fibreglass and are extremely stable yet flexible: an extremely welcome combination. The robust construction of the tent with tear-resistant material, sealed seams and reinforced eyelets and flaps make the HELSINKI a good investment. A practical packing bag with detailed assembly instructions, extensive accessories (guy ropes, pegs, etc.) and a repair kit are included just in case!
![]() | ![]() | ![]() | ![]() | |
| Name | Helsinki 6 tunnel tent | Daytona 6 Protect XL dome tent | Gotland 6 Protect tunnel tent | Kambo 6 tunnel tent |
| Carrier bag | Yes | Yes | Yes | Yes |
| Ceiling hook | Yes | Yes | Yes | Yes |
| Dimensions (LxWxH) (cabin) | with partition wall each 210 cm x 195 cm x 205 cm | 200 cm x 170 cm x 185 cm each | with partition wall each 215 cm x 210 cm x 200 cm | 210 cm x 350 cm x 190 cm |
| Dimensions (LxWxH) (total) | 525 cm x 410 cm x 215 cm | 3 x 205 cm x 175 cm x 185 cm 205 cm x 220 cm x 195 cm | 540 cm x 450 cm x 210 cm | 480 cm x 360 cm x 200 cm |
| Floor | Removable | Protect (sewn-in) | Protect (sewn-in) | Removable |
| Inputs | 1 | 1 | 3 | 3 |
| Item no. | 16511 | 5010 | 1974 | 5004 |
| Linkage | Fibreglass | Fibreglass Steel | Fibreglass Steel | Fibreglass Steel |
| Material (cabin) | Breathable Polyester | 190T polyester Breathable | 190T polyester Breathable | 190T polyester Breathable |
| Material (floor) | 120 g/m² PE Waterproof | 120 g/m² PE | Waterproof 120 g/m² 10 x 10 PE | 120 g/m² PE Waterproof |
| Material (outer tent) | PU coated 150D polyester | 190T polyester PU coated | PU coated 68D 190T Polyester | 190T polyester PU coated |
| Mosquito nets | Sleeping cabins Entrance | Sleeping cabins Ventilation openings | Sleeping cabins Inputs Windows | Windows Sleeping cabin |
| Number of cabins | 1 2 with partition wall | 3 | 1 2 with partition wall | 1 |
| Number of persons | 6 persons | 6 persons | 6 persons | 6 persons |
| Organiser bag | Yes | Yes | Yes | Yes |
| Pack size | 72 cm x 33 cm x 26 cm | 72 cm x 25 cm x 27 cm | 76 cm x 39 cm x 34 cm | 70 cm x 27 cm x 22 cm |
| Scope of delivery | Carrier bag Repair kit Guy ropes Pegs | Carrier bag Repair kit Guy ropes Pegs | Carrier bag Guy ropes Pegs | Carrier bag Repair kit Guy ropes Pegs |
| Seams | Waterproof sealed | Waterproof sealed | Waterproof sealed | Waterproof sealed |
| UV resistance | Yes | Yes | Yes 50+ | Yes |
| Water column | 5000 mm | 3000 mm | 5000 mm | 3000 mm |
| Weight | 18 kg | 13 kg | 23,5 kg | 12 kg |
| Windows | Slide Venetian blinds Mosquito nets | Ventilation openings | Slide Venetian blinds Mosquito nets | Slide Venetian blinds |
| Colour | blue | anthracite/green | green | anthracite/green |
Any questions? We're here to help you!
Send us a message here

















