Hafslo 5 Sleeper Protect tunnel tent

5-person tent with dark sleeping cabins and sewn-in groundsheet

Size

Colour

419,00 €
RRP 529,00 €

Free delivery in GER

2-year warranty

30-Day Returns Policy

second-chance-icon

Also available in different conditions

Buy B-Ware Tunnelzelt Hafslo 5 Sleeper Protect in good condition

251,40 €

View item

Highlights

  • Dark sleeping cabin thanks to Skandika Sleeper Technology for restful sleep
  • One large sleeping cabin with optional partition wall
  • Mosquito nets at the entrance and on the windows
  • Entrance with sun canopy
  • High water column of 5,000 mm

Hafslo 5 Sleeper Protect

The Skandika Hafslo Sleeper Protect is a well-designed tunnel tent for up to 5 people with a host of great features. It is super quick and easy to pitch and allows even camping novices to enjoy exciting outdoor adventures without having to compromise on comfort.

  • Stylish 5-person tunnel tent for families and friends who like it simple as well as comfortable.
  • Skandika Sleeper Technology with dark sleeping cabins and special coating
  • Light and airy with clever PVC/mesh side windows for views, protection, and ventilation
  • Panorama windows in the front wall, which has a practical canopy with a sun tarp
  • Cabin with optional partition (2/3 persons) for more flexibility and privacy
  • Absolutely weatherproof and sturdy with 5,000 mm water column and shatterproof fibreglass poles
  • Size 370 × 495 × 200 cm / cabin 350 × 215 cm / pack size 75 × 39 × 30 cm / weight 18.1 kg

Clever und comfortable

The well thought-out design is perfect for families or groups of friends who want to pitch their tent quickly and easily and enjoy a high level of comfort during their stay. Simplicity and comfort go hand in hand with the Hafslo Sleeper Protect.

Skandika Sleeper Technology

For this tent, a special coating has been applied to the outer tent in the area around the sleeping cabin, which absorbs almost 100% of sunlight. Want to sleep in longer, put the kids to bed earlier, or take a nap at lunchtime? No problem at all!

Allround Protection with Easy Entry

With a firmly sewn-in tent floor and mosquito mesh on all doors, the Hafslo provides ideal protection against draughts, damp, and annoying insects. The floor can be folded down at the front when the entrance door is open to avoid the usual risk of tripping - a smart safety detail.

Flexible Sleeping Cabin

If required, the cabin can be divided using a roll-up partition wall to create two sleeping areas for up to 2 or 3 people respectively. Small organiser pockets and a hook for a camping lamp are located in both parts of the cabin. The doors have mesh inserts with blinds for better ventilation.

Smart Windows

Two large side windows provide plenty of light even when the doors are closed. These can either be zipped closed to keep them completely weatherproof, or they can be pulled taut using two guy ropes. Made of PVC at the bottom and mosquito mesh at the top, the side windows always ensure good air circulation.

Canopy on the Front Wall

The living area of the Hafslo is perfectly complemented by the canopy with its sun tarp, which is firmly sewn onto the front wall. The shaded area invites you to linger in fine weather and is a sheltered retreat on balmy summer evenings. The entrance door is always well protected from the weather.

Weatherproof and Secure

The Hafslo Sleeper Protect is absolutely wind- and weatherproof. Made of hard-wearing tent material with a water column of 5,000 mm, the tunnel tent braves all weathers and the flexible, yet shatterproof fibreglass poles ensure the tent always stands firm.

Comfortable and Inviting

Panorama windows in the front wall contribute to the pleasant feeling inside the tent, and practical details such as organiser pockets, ceiling hooks, cable entry points, neon-coloured guy ropes and strong aluminium line tensioners provide additional comfort and safety.

A Wide Range of Uses

The Hafslo Sleeper Protect looks good at any campsite and is also perfect for the next music festival or a children's sleepover party in the garden. And when your holiday is over, the sturdy carry bag makes transport and dust-free storage of the tent a breeze.

Any questions? We're here to help you!

Send us a message here

Accessoires

Customer Reviews