Hammerfest 8 Sleeper Protect

Tent for families with dark sleeping cabins and sewn-in groundsheet

RRP 399 €You save 130 €
269 €

In stock

Free delivery in GER

2-year warranty

30-Day Returns Policy

Hammerfest Protect 8 person dome tent

The town of Hammerfest in northern Norway is considered the northernmost town in the world. Here you can experience breathtaking nature, deserted expanses and the midnight sun in summer. The sky-blue tent from Skandika was named after this town for the colours of the sea water and the sky, but not only cuts a fine figure in the far north, but also here at home on the campsite or at a festival!

The Hammerfest 8 Protect is the right choice for families or a group of friends and offers sufficient privacy with two sleeping cabins facing each other.

The stylish dome tent has a firmly sewn-in groundsheet and the entrances are fitted with mosquito netting to keep out pesky insects and creepy-crawlies. Both doors can be converted into a sun canopy using the steel poles supplied, allowing optimum ventilation of the living area on warm days and providing shade in the entrance areas.

The large black sleeping cabins offer plenty of space for 4 people each and also have mosquito netting at the entrances to protect against insects. The inner cabins can be flexibly attached and detached as required, making it easy to vary the size of the living space.

Many extras such as a hook for hanging a camping lamp, small organiser pockets in the cabins and weather-protected ventilation openings for constant air circulation even when the doors are closed make the Hammerfest a very practical and comfortable tent that is also quick and easy to pitch thanks to colour-coded poles.

Sturdy fibreglass poles, the waterproof tent material with a 3,000 mm water column and the sealed seams ensure that the Hammerfest Protect remains stable in wind and weather and that everything stays dry.

Families and groups of up to eight people can make themselves comfortable in this practical tent. The Hammerfest Protect is also available in two other sizes for four and six people.

  • Capacity: 4 people
  • 2 weather-protected entrances
  • Firmly sewn-in groundsheet
  • Sun canopy at both entrances (pitching poles included)
  • Entrances and sleeping cabins with mosquito net
  • Good air circulation
  • Hook for a lantern
  • Organiser pockets in the cabins
  • Flysheet: 100% polyester, PU coated, seam-sealed
  • Inner tent: 100% polyester, breathable, dark material
  • Tent floor: 100% polyethylene (PE)
  • Water column: 3,000 mm
  • Dimensions: 640 x 300 cm
  • Standing height: 200 cm
  • Poles: fibreglass 9.5/11.0 mm, steel pitching poles 16 mm
  • Colour-coded poles
  • Pack size: 68 x 28 x 28 cm
  • Weight: 14.8 kg
  • Colour: blue

Any questions? We're here to help you!

Send us a message here

Accessoires

Matratze in grauer Farbe mit einem Aufkleber, der den R-Wert von 9,6 und das Logo von Skandika zeigt.

Easy 3D Premium double insulation mat

0

219,00 €RRP 279,00 €
Faltbarer Sichtschutz in Grau mit transparenten oberen Streifen und gelben Abspannleinen. Markierung „Skandika“ sichtbar.

Bora 600 windscreen

0

74,95 €RRP 89,95 €
Runder, gepolsterter Sessel in Grau mit stabilem, schwarzem Gestell. Polsterung mit Steppnähten.

Moonchair Premium XL camping chair

0

69,95 €RRP 119,00 €
Schlafsack in Schwarz mit orangefarbener Innenseite und einem kompakten Packsack. Breite: 110 cm. Markenetikett erwähnt Qualität.

Sleeping bag Vegas 220 zip left

0

59,95 €RRP 74,95 €

Customer Reviews