
Vaasa 4 dome tent
4-person tent with dark sleeping cabin and large vestibule
In stock
Free delivery in GER
2-year warranty
30-Day Returns Policy
Highlights
- Outer tent with silver coating for dark sleeping cabin
- Colour-coded rods made of unbreakable fibreglass
- Window with mosquito net and sun protection
- Opening in the roof for ideal air circulation
- Comfortable standing height of 195 cm
Also available in different conditions

Vaasa dome tent
The Skandika Vaasa is a compact tent for up to 4 people that is quick and easy to pitch, looks stylish and is perfect for holidays or festival visits. The big plus point of this tent is the black sleeping cabin and the silver coating of the outer tent in the cabin area. Although this combination of black cabin and silver coating does not come close to the blackout level of the Skandika Sleeper technology, it still contributes to a noticeable darkening effect.
- Compact dome tent for up to 4 people with a standing height of up to 195 cm
- Black cabin and silver-coated flysheet provide noticeable darkening
- Sleeping cabin with mosquito net and sewn-in groundsheet for all-round protection
- Two entrances and a window provide flexibility in terms of light and air
- Waterproof with a 3,000 mm water column and sturdy fibreglass poles
- Quick and easy to pitch with just 3 colour-coded poles
- With many practical extras and a pleasantly compact pack size

Compact dome tent
The Skandika Vaasa is a compact tent for up to 4 people that is quick and easy to pitch, looks stylish in black with green accents and is perfect for holidays or festival visits.

Two entrances
Two opposing entrances and a mesh window at the head end of the tent allow great flexibility in terms of light and air, regardless of which way the wind is blowing, and ensure a pleasant indoor climate inside the tent.

Restful sleep
The outer tent in the sleeping cabin area has a silver coating. Although the combination of black cabin and silver coating does not come close to the blackout level of the Skandika Sleeper technology, it still contributes to a noticeable darkening effect.

Matching groundsheet
A matching groundsheet is supplied for the vestibule, which can be anchored separately to protect luggage and supplies from dirt and water. The hard-wearing material is robust and completely waterproof.

Protected sleeping cabin
The attractive dome tent has a spacious black sleeping cabin for up to 4 people. The firmly sewn-in floor and the mosquito net on the door ensure all-round protection and a good night's sleep without draughts or annoying insects.

Weatherproof
The hard-wearing tent material has a water column of 3,000 mm and the flexible poles made of unbreakable fibreglass poles are extremely robust, ensuring that the tent is safe and stable even in bad weather and protects its occupants well.

Practical extras
The Vaasa not only impresses with its compact size, but also with many practical extras: colour-coded poles to make pitching easier, small storage pockets for mobile phone, torch etc. in the sleeping cabin and a repair kit for emergencies.

Handy pack size
Despite its generous surface area and comfortable standing height of 195 cm, the tent has a handy pack size and weighs just 8.8 kg. It is therefore easy to transport and stow away and always remains protected in its practical carry bag.

Versatile in use
Whether at a music festival or on a road trip, for four people or just the two of you, the Vaasa is a practical dome tent with compact dimensions that is ready for any kind of fun.
![]() | ![]() | ![]() | |
| Name | Vaasa 4 dome tent | Kambo 4 tunnel tent | Hammerfest 4 Sleeper Protect dome tent |
| Carrier bag | Yes | Yes | Yes |
| Dimensions (LxWxH) (cabin) | 280 cm x 210 cm x 185 cm | 210 cm x 255 cm x 155 cm | 200 cm x 130 cm x 190 cm each |
| Dimensions (LxWxH) (total) | 425 cm x 295 cm x 195 cm | 420 cm x 275 cm x 165 cm | 500 cm x 220 cm x 200 cm |
| Floor | Removable | Removable | Protect (sewn-in) |
| Inputs | 2 | 3 | 2 |
| Item no. | 5007 | 5003 | 4506 |
| Linkage | Fibreglass | Fibreglass Steel | Fibreglass Steel |
| Material (cabin) | 190T polyester Breathable | 190T polyester Breathable | Breathable Polyester |
| Material (floor) | 120 g/m² PE | 120 g/m² PE Waterproof | PE |
| Material (outer tent) | 190T polyester PU coated | 190T polyester PU coated | PU coated Polyester |
| Mosquito nets | Windows Sleeping cabins | Sleeping cabin Windows | Inputs Sleeping cabins |
| Number of cabins | 1 | 1 | 2 |
| Number of persons | 4 persons | 4 persons | 4 persons |
| Organiser bag | Yes | Yes | Yes |
| Pack size | 70 cm x 21 cm x 21 cm | 64 cm x 21 cm x 22 cm | 70 cm x 26 cm x 26 cm |
| Scope of delivery | Carrier bag Repair kit Guy ropes Pegs | Carrier bag Repair kit Guy ropes Pegs | Carrier bag Repair kit Guy ropes Pegs |
| Seams | Waterproof sealed | Waterproof sealed | Waterproof sealed |
| UV resistance | Yes | Yes | Yes |
| Water column | 3000 mm | 3000 mm | 3000 mm |
| Weight | 8,8 kg | 8 kg | 10,5 kg |
| Windows | Venetian blinds Mosquito nets | Slide Venetian blinds | Ventilation openings |
| Colour | black/green | anthracite/green | blue |
Any questions? We're here to help you!
Send us a message here












